«The groups that are impacted are the waterharvesters with high passing flow thresholds associated with their water licences, reflecting the reduction in medium to high flows» the EIS states.
«Appropriate compensation strategies for existing water users will be developed at later stages of the project» and «in conjunction with local irrigator groups» it states.
SunWater will be conducting information sessions at the following locations:
For further details about the project, the EIS, public display locations and the approval process contact SunWater on 1800 158 651 or visit www.sunwater.com.au/future-develo pments/nathan-dam
The EIS consultation period for the Nathan Dam and Pipelines project ends on June 5, 2012.
Читать полностью или написать коммент.. Про установку спутниковых тарелок в Московской областиhttp://tarelka-tv.ru/
Комментариев нет:
Отправить комментарий